Skip to content
Temporary Building QuotesGet a quote
A large framed building on open ground

Temporary Buildings for Sale

Buying a temporary building means you own the frame and cladding outright. You can keep it as long as your permissions allow, move it to another site, or sell it on. Suppliers sell new steel buildings and, at times, buildings coming back from hire.

Buying makes most sense when the need is long or open-ended, or when the hire charges would add up to more than the building over the time you expect to keep it.

Get a quote

Is it the right building for you?

These are the jobs this kind of building usually does:

  • A long or open-ended need for storage or production space.
  • Repeat use, where the same building goes up every season.
  • Several sites, where one building may move between them.
  • Budget rules that favour a one-off capital cost over a monthly charge.

Not sure of the size yet? The spec planner helps.

Buying new or used
PointNewUsed
DesignDesigned for your span, height and siteFixed by what is available
ConditionNew frame and claddingCheck frame, fixings and cladding
PaperworkDesign calculations for your siteAsk what design records come with it
Lead timeDepends on the supplier and specCan be quicker if a building is in stock
ErectionUsually offered by the supplierConfirm who erects it and checks it

When buying beats hiring

There is no published rule of thumb we would trust for the point at which buying gets cheaper. It depends on the size, the spec and the supplier. The honest way to find it is to ask for a hire price and a purchase price for the same building, then add up the hire charges for the time you expect to keep it.

Do not forget the costs that come with ownership: insurance, maintenance, and dismantling and moving it later.

Checking a used building

A second-hand frame can be good value, but ask what it was designed for and what records come with it. A frame checked for one site may need fresh design checks for wind and snow on yours.

Look at the condition of the steel, the connections and the cladding, and ask whether the supplier will erect it and stand behind the work.

Owning it does not change the rules

A building you own needs the same permissions as a hired one. Most uses other than construction work on the land need planning permission, and a building meant to stay more than 28 days usually needs Building Regulations approval unless another Schedule 2 exemption covers it (Schedule 2 to the Building Regulations 2010).

If the building stays without the right permission, councils can take enforcement action. For breaches substantially completed on or after 25 April 2024 the time limit in England is ten years (GOV.UK enforcement guidance).

From enquiry to a building on site

  1. Brief

    Size, use, ground, doors and the date you need it. A site plan and photos help.

  2. Survey and design

    The supplier checks access and ground, then designs the frame for your site.

  3. Approvals and base

    Planning and Building Regulations where needed, and any ground works.

  4. Erection and handover

    The frame goes up, doors and services go in, and you get the keys.

Questions about temporary buildings for sale

Are used temporary buildings worth buying?

They can be, if the frame is in good condition, comes with design records and can be checked for your site. Ask the seller to erect it or recommend someone who will.

Can I move a bought building later?

Demountable buildings are designed to be taken down and put up again. A new site may need new design checks and permissions.

Does a bought building need planning permission?

Usually, yes, unless it is needed only for construction work on the land. Ownership makes no difference to planning.

Is it cheaper to buy or hire?

It depends on how long you keep it. Ask suppliers for both prices on the same spec and compare them over your expected period.

Do I need Building Regulations approval?

Usually, for a building meant to stay more than 28 days, unless another Schedule 2 exemption covers it (Schedule 2 to the Building Regulations 2010).

Sources for this page

Ask for a temporary building quote

We find a temporary building supplier who covers your site and give you their name before any of your details go to them. It costs you nothing.

  • You tell us the job. Where the site is, what the building is for, and when you need it.
  • We look for a supplier. One who hires or sells that kind of building in your part of the country.
  • You decide. We name them first, and your details only go to them if you say yes.
Step 1 of 3
Where will the building go?
Get a quote