Skip to content
Temporary Building QuotesGet a quote
Looking up at the steel roof frame of a building

Temporary Workshop Buildings

A temporary workshop gives a team covered, lit space to maintain vehicles, repair plant or fabricate parts without waiting for a permanent building. Most are smaller steel-framed buildings with one or two large doors and a pedestrian door.

The details that matter most are the doors, the power and whether people will work inside for long hours in winter.

Get a quote

Is it the right building for you?

These are the jobs this kind of building usually does:

  • Fleet maintenance at a depot that has outgrown its bays.
  • Plant repairs on a long construction or infrastructure contract.
  • Fabrication close to where the parts are installed.
  • A stopgap while a permanent workshop is planned and built.

Not sure of the size yet? The spec planner helps.

What to decide for a temporary workshop
DecisionOptionsWorth knowing
Main doorRoller shutter or sectional doorMeasure the tallest vehicle with anything raised.
Pedestrian doorsOne or more, often with panic hardwareEscape routes come from the fire risk assessment.
Power and lightingSupplier-fitted or your own electricianAgree who tests and certifies the installation.
HeatingUsually only worth it with insulated panelsHeat escapes quickly through an uninsulated roof.
FloorExisting slab or a new oneVehicle lifts and stands need a suitable floor.

People will be working in it all day

A storage tent can be cold and dim and still do its job. A workshop cannot, because people are standing in it for a full shift. Think about light at the bench, heat in January, ventilation for exhaust and welding fumes, and somewhere to wash.

If you plan to heat the building, ask for insulated panels from the start. Heating an uninsulated roof is mostly heating the sky.

Fire safety does not stop at the door

Workshops bring hot work, fuels and compressed gases into a new building. Under the Regulatory Reform (Fire Safety) Order 2005 the responsible person must carry out a fire risk assessment, and that includes temporary buildings on your premises.

Share the main findings with the supplier early. Escape doors, extinguisher points and separation from other buildings are much easier to design in than to add after the frame is up.

Rules for a workshop that stays

A workshop needed only for construction work on the same land can be permitted development under Class A of Part 4 of the permitted development order. A permanent depot that needs more bays is a different case, and a planning application is the normal route.

Once a building is meant to stay more than 28 days, Building Regulations usually apply unless another exemption in Schedule 2 to the Building Regulations 2010 covers it. That takes in most workshops.

From enquiry to a building on site

  1. Brief

    Size, use, ground, doors and the date you need it. A site plan and photos help.

  2. Survey and design

    The supplier checks access and ground, then designs the frame for your site.

  3. Approvals and base

    Planning and Building Regulations where needed, and any ground works.

  4. Erection and handover

    The frame goes up, doors and services go in, and you get the keys.

Questions about workshop buildings

How big should the main door be?

Measure the tallest and widest thing that needs to come in, with any cab, mast or load raised, and add working room. Give those figures to the supplier rather than a door size off a brochure.

Can I put a vehicle lift in a temporary workshop?

Possibly, but the floor and fixings must suit it. Tell the supplier early so they can check the slab or include a suitable base.

Who connects the power?

Some suppliers fit lighting and sockets; others leave that to your electrician. Agree in writing who installs, tests and certifies it.

Does a workshop need Building Regulations approval?

Usually, if it is meant to stay more than 28 days, unless another Schedule 2 exemption covers it (Schedule 2 to the Building Regulations 2010). Most workshops stay longer than that.

Can the workshop be moved when the contract ends?

Demountable steel buildings are designed to come down and go back up. Ask whether the supplier will move it or buy it back.

Sources for this page

Ask for a temporary building quote

We find a temporary building supplier who covers your site and give you their name before any of your details go to them. It costs you nothing.

  • You tell us the job. Where the site is, what the building is for, and when you need it.
  • We look for a supplier. One who hires or sells that kind of building in your part of the country.
  • You decide. We name them first, and your details only go to them if you say yes.
Step 1 of 3
Where will the building go?
Get a quote