Temporary Building Size and Spec Planner
Put in the size and the main choices. The planner works out the floor area, draws the end of the building to scale, flags the rules that may apply in England and writes a short spec. Send it with your enquiry so every supplier quotes on the same building.
A planning tool, not a quote. No prices are shown.
450 m² floor area
End view to scale (width and eaves). Roof pitch drawn for illustration only. Figure shown is 1.8 m tall.
Your written spec
Using the spec
The same written spec sent to two or three suppliers is the simplest way to get prices you can compare. Without it, one supplier may quote a lower eaves height or fewer doors and look cheaper for the wrong reasons.
Suppliers will still want to see the site before a firm price. Ground, access and overhead cables change what can go where.
About the planner
Why does the planner not show a price?
Because we have not found a published hire or purchase rate per square metre for steel-framed temporary buildings that we would put our name to. Prices swing with span, height, cladding, doors, ground and location. A clear spec sent to suppliers gets you real, comparable figures instead.
What is the clear span?
The internal width between the columns of a portal frame. Nothing stands in the middle, so the span is the width you can use for racking, aisles or vehicles.
What is the eaves height?
The height from the floor to where the roof meets the wall, the lowest point of the roof. Racking, forklift masts and door heads have to fit under it.
Is the end view drawn to scale?
Yes, the width and eaves height are drawn to the same scale from your figures. The roof pitch is drawn at a typical shallow angle for illustration; each supplier designs their own.
Why does the length of stay matter?
In England a temporary building meant to stay more than 28 days usually needs Building Regulations approval unless another Schedule 2 exemption covers it (Schedule 2, Class IV). Hire terms and planning consents also run for set periods.
Ask for a temporary building quote
We find a temporary building supplier who covers your site and give you their name before any of your details go to them. It costs you nothing.
- You tell us the job. Where the site is, what the building is for, and when you need it.
- We look for a supplier. One who hires or sells that kind of building in your part of the country.
- You decide. We name them first, and your details only go to them if you say yes.
Thank you. Your enquiry has reached us.
Here is what happens from here.
- We look for a supplier who covers your site and puts up the kind of building you described.
- We contact you with their name. If you are happy for them to have your details, we pass them on. If not, nothing is shared.
- The supplier confirms the spec, the ground works and the price in writing. We send no marketing.