Temporary Building Hire

Hiring means the supplier owns the building, puts it up on your site, charges you for the time you keep it and takes it away at the end. Steel-framed buildings are commonly hired month by month; portable cabins by the week.

It suits a need with an end date, or one you are not yet sure about. The quotes you get will look different from one supplier to the next, so it pays to know what to compare.

Get a quote

Is it the right building for you?

These are the jobs this kind of building usually does:

  • A fixed period, such as a peak season, a refit or a contract.
  • An uncertain need you want to test before committing to a permanent building.
  • Events that need cover for a short, known run of days.
  • Capital constraints, where a monthly cost is easier to approve than a purchase.

Not sure of the size yet? The spec planner helps.

Lines to look for on a hire quote
LineWhat it usually coversCheck
Hire chargeThe building for each week or monthMinimum hire period and notice to end it.
Delivery and erectionTransport, labour and lifting equipmentWhether it is quoted separately.
Dismantle and removalTaking it down at the endPaid at the start or the end.
Ground worksAny base, anchors or levellingWho does it and who removes it.
ExtrasDoors, lighting, gutters, insulationCharged per week or once.
Insurance and damageCover while it is on your siteWhose policy and what is excluded.

Compare like with like

One quote may show a low monthly rate with delivery, erection and dismantling priced separately; another may bundle them in. Add every line together over the period you expect to keep the building before deciding which is cheaper.

Also check the minimum hire term and what happens if you need the building for longer. Extending is usually easy; ending early may not be.

Short hires and events

For a building that will be up for 28 days or less, the Building Regulations exemption for temporary buildings can apply (Schedule 2 to the Building Regulations 2010). Planning for short uses of land has its own rules, so check with your council's planning team before you book.

Event structures also have their own safety guidance. The HSE has a page on temporary demountable structures at events, and the IStructE guidance covers design and use.

When a hire runs on

A hire that starts as "a few months" often runs for years. Keep an eye on the end date of any temporary planning consent. Councils can take enforcement action against unauthorised building work, and for breaches substantially completed on or after 25 April 2024 the time limit in England is ten years (GOV.UK enforcement guidance).

If you can see the hire running on, ask for a buy price too. Our buying page covers what to check.

From enquiry to a building on site

  1. Brief

    Size, use, ground, doors and the date you need it. A site plan and photos help.

  2. Survey and design

    The supplier checks access and ground, then designs the frame for your site.

  3. Approvals and base

    Planning and Building Regulations where needed, and any ground works.

  4. Erection and handover

    The frame goes up, doors and services go in, and you get the keys.

Questions about temporary building hire

How long can I hire a temporary building for?

As long as you need it and your planning permission allows. Hire terms are commonly monthly for steel-framed buildings and weekly for cabins, with a minimum period.

Is delivery included in the hire price?

Sometimes. Many suppliers quote delivery, erection and dismantling separately from the hire charge. Ask for every line so you can compare totals.

Do I need planning permission to hire a building?

Hiring does not change the planning position. A building needed only for construction work on the land can be permitted development (Class A of Part 4 of the permitted development order); most other uses need an application.

Can I hire a building for an event?

Yes. Tell the supplier the event dates, the number of people and the ground. Short hires can fall under the 28-day Building Regulations exemption, but check planning with your council.

Can I buy the building at the end of the hire?

Some suppliers will sell a hired building. Ask at the start whether part of the hire paid can count towards a purchase.

Sources for this page

Ask for a temporary building quote

We find a temporary building supplier who covers your site and give you their name before any of your details go to them. It costs you nothing.

  • You tell us the job. Where the site is, what the building is for, and when you need it.
  • We look for a supplier. One who hires or sells that kind of building in your part of the country.
  • You decide. We name them first, and your details only go to them if you say yes.
Step 1 of 3
Where will the building go?
Get a quote