
Temporary School Buildings
When a school hall, dining room or sports space is closed for a rebuild or repairs, a large temporary building can keep the timetable going. These are usually steel-framed, clear-span halls rather than classroom cabins, fitted out with flooring, lighting and heating.
For an estates or business manager the hard parts are rarely the building itself. They are the timing, the space on site, and keeping pupils safe while it goes up and comes down.
Is it the right building for you?
These are the jobs this kind of building usually does:
- Assembly and dining while the main hall is out of use.
- PE and sports during a sports hall rebuild.
- Exam space for a known exam season.
- Decant storage for furniture and equipment during works.
Not sure of the size yet? The spec planner helps.
| Item | What to ask for | Why |
|---|---|---|
| Walls and roof | Insulated panels for a winter term | Comfort and running costs. |
| Floor | A level floor suited to the use | Sports, dining and exams need different finishes. |
| Doors | Enough exits for the number of pupils | Set by the fire risk assessment. |
| Services | Lighting, heating, power, and sound where needed | Agree who installs and certifies each one. |
| Links | A covered route to the main building | Weather and safeguarding. |
Work back from the holidays
Most schools want the building up and handed over before term starts and gone again in a later holiday. Planning, Building Regulations approval, ground works and delivery all have to fit in front of that date, so start talking to suppliers well before the summer.
If the hall is replacing one that is being rebuilt, the temporary building may be covered by the main project. A building needed only while construction work is carried out on the same land can be permitted development under Class A, provided it comes down when the work ends.
A building site next to the playground
Putting up a large frame is construction work, so the school or trust has client duties under CDM 2015, and the HSE guidance for commercial clients explains them. Agree delivery times, fenced areas and lifting plans that keep pupils well away.
Once it is in use, the hall needs its own fire risk assessment under the Regulatory Reform (Fire Safety) Order 2005, with exits and alarms sized for the number of people inside.
Approval for a building that stays a term
The Building Regulations exemption for temporary buildings only covers buildings not meant to stay more than 28 days (Schedule 2 to the Building Regulations 2010). A hall used for a term or longer will usually need approval, unless another Schedule 2 exemption covers it. Ask who applies and whether the fee is included.
From enquiry to a building on site
Brief
Size, use, ground, doors and the date you need it. A site plan and photos help.
Survey and design
The supplier checks access and ground, then designs the frame for your site.
Approvals and base
Planning and Building Regulations where needed, and any ground works.
Erection and handover
The frame goes up, doors and services go in, and you get the keys.
Questions about school halls and decant space
Is this the same as a temporary classroom?
No. This page is about large open halls for dining, sport, assembly, exams and storage. Classroom units are a different kind of building with their own suppliers.
Does a temporary school hall need planning permission?
If it is needed only while building work is carried out on the school site and is removed when the work ends, it can be permitted development (Class A of Part 4 of the permitted development order). Otherwise expect an application.
Can it be heated?
Yes. Insulated panel buildings can be heated sensibly; uninsulated PVC buildings lose heat quickly. For a winter term, ask for insulation.
Who carries out the fire risk assessment?
The responsible person for the premises, under the Regulatory Reform (Fire Safety) Order 2005. For a school that is usually the employer or whoever controls the site.
How much space does it need?
The footprint plus working room around it for delivery and erection. A supplier will want a site plan showing access, trees, cables and drains.
Sources for this page
Ask for a temporary building quote
We find a temporary building supplier who covers your site and give you their name before any of your details go to them. It costs you nothing.
- You tell us the job. Where the site is, what the building is for, and when you need it.
- We look for a supplier. One who hires or sells that kind of building in your part of the country.
- You decide. We name them first, and your details only go to them if you say yes.
Thank you. Your enquiry has reached us.
Here is what happens from here.
- We look for a supplier who covers your site and puts up the kind of building you described.
- We contact you with their name. If you are happy for them to have your details, we pass them on. If not, nothing is shared.
- The supplier confirms the spec, the ground works and the price in writing. We send no marketing.