What is classed as a temporary structure in the UK?

Basics By Temporary Building Quotes · Updated · 3 min read

A portable office unit on site

In brief

There is no one legal definition. In England, planning treats a building as temporary under Class A when it is needed for construction work on the land. Building Regulations treat it as temporary only if it will not stay more than 28 days. Fire safety law applies to it either way.

On this page
  1. Why there is no single definition
  2. How planning treats it
  3. How Building Regulations treat it
  4. How fire safety law treats it
  5. Where common buildings fall
  6. A worked example
  7. So which kind is yours?

In everyday use, a temporary structure is anything you can put up and take away again: a marquee, a site cabin, a steel-framed storage building. Suppliers use the word that way too. The rules, though, don’t share one definition, and each asks a slightly different question.

This post sets out how the main sets of rules in England treat temporary buildings and structures, with examples of where common buildings fall. Wales, Scotland and Northern Ireland have their own versions of these rules.

Why there is no single definition

“Temporary” can mean three different things depending on who is asking:

  • Planning cares about why the building is there and whether it has permission.
  • Building Regulations care about how long it is meant to stay.
  • Fire and safety law cares about people using it, however long it stays.

So the honest answer to “is my building temporary?” is “temporary for which purpose?”

How planning treats it

The permitted development order gives a ready-made permission, in Part 4, Class A, for buildings and moveable structures needed temporarily in connection with construction work on that land or next to it. They must be removed when the work is complete.

Outside that, planning does not have a special “temporary building” category. A demountable warehouse is development like any other, and it needs permission. The difference is that councils can grant permission for a limited period, which is how many such buildings are approved.

How Building Regulations treat it

The Building Regulations 2010 exempt temporary buildings, defined as buildings not intended to remain where they are erected for more than 28 days.

That is the narrowest of the definitions. A building can be “temporary” in the sense of being demountable and still be a normal building for Building Regulations purposes because it stays for months.

How fire safety law treats it

The Regulatory Reform (Fire Safety) Order 2005 applies to non-domestic premises, and the responsible person must carry out a fire risk assessment. A temporary building used as part of your business does not escape that because it is temporary.

For events, the HSE has a page on temporary demountable structures such as stages, stands and marquees, which is worth reading if your building is for an event.

Where common buildings fall

The table shows how the tests play out for some typical buildings in England.

Building Planning Building Regulations Fire risk assessment
Site office during construction on the same land Class A permitted development, removed at the end Depends on how long it stays and on other exemptions Yes
Marquee for a three-day event Ask the council about short-term use Exempt if it stays 28 days or less Yes
Steel storage building for a peak season Planning application, often for a limited period Usually needed (over 28 days), unless another exemption applies Yes
Hall for a school term during a rebuild Class A if tied to the rebuild on the same site; otherwise an application Usually needed (over 28 days), unless another exemption applies Yes

Notice that the fire risk assessment column never changes.

A worked example

An events manager books a clear-span structure for a two-week trade show on a business park car park. For Building Regulations, two weeks is under 28 days, so the temporary building exemption can apply. For planning, short-term uses of land have their own rules, so the manager asks the council’s planning team before booking. For fire safety, the event organiser carries out a fire risk assessment covering the structure, the number of visitors and the exits.

Now change one thing: the client decides to keep the structure for six months as overflow storage after the show. It is the same frame on the same car park, but it now usually needs Building Regulations approval and, almost certainly, a planning application.

So which kind is yours?

Ask three questions: is it there for construction work on this land, will it stay more than 28 days, and will people use it? The answers tell you which rules apply.

If you already know the building you need, our temporary office buildings and industrial buildings pages go through the details suppliers will ask about.

Sources for this post

Ask for a temporary building quote

We find a temporary building supplier who covers your site and give you their name before any of your details go to them. It costs you nothing.

  • You tell us the job. Where the site is, what the building is for, and when you need it.
  • We look for a supplier. One who hires or sells that kind of building in your part of the country.
  • You decide. We name them first, and your details only go to them if you say yes.
Step 1 of 3
Where will the building go?
Get a quote